Development Case of Intermediate Test Equipment
Execute each test based on instructions from the mechanical control PLC (developed by another company)! There is also a half of the moaning test developed by another company.
We would like to introduce a case where we developed the program for the intermediate test line of the Fuji Electric Breaker (Fr1 series), specifically for running test 1/2 and operation test 1/2 (modified from the Fr3 series program). Command communication via ASR102-351 (TEXIO) and Ethernet (PROTOCOL STUDIO) is used to execute settings and inquiries (setting information and voltage values). Adjustment of the time until the applied voltage stabilizes is necessary. [Test Contents] ■ Running Test: Running, wipe, operation time, open time ■ Operation Test: Mouth opening, operating voltage, excitation current, open voltage *For more details, please download the PDF or feel free to contact us.
- Company:富士オートメーション
- Price:Other